A new township is proposed in Western Tasmania, Australia. The township is planned…

Our academic writers are ready and waiting to assist with any assignment you may have. From simple essays to full dissertations, you're guaranteed we've got a writing expert to perfectly match your needs.


Order a Similar Paper Order a Different Paper

A new township is proposed in Western Tasmania, Australia. The township is planned for 200 households and 15 small business outlets (cafes, a child care, a service station, etc.). Several dairy farms with up to 30,000 dairy cows will be operating near the township. To provide water to the township and the dairy farms, a water storage reservoir is proposed to be constructed not far from the future township. The reservoir will be constructed in an existing valley. Water will be supplied from the reservoir to the townships and farms through two separate water supply systems. Figure 1 shows preliminary design decisions for the township, the dairy farms and the reservoir. As an engineering design consultant, you are asked to provide a conceptual design of the water storage reservoir and the water supply systems. The conceptual design has to address several key aspects of these facilities that are outlined as separate tasks below. The conceptua

Document Preview:

CVEN30010 System Modelling and Design 2017 Design Brief Revision 03_20170901 A new township is proposed in Western Tasmania, Australia. The township is planned for 200 households and 15 small business outlets (cafes, a child care, a service station, etc.). Several dairy farms with up to 30,000 dairy cows will be operating near the township. To provide water to the township and the dairy farms, a water storage reservoir is proposed to be constructed not far from the future township. The reservoir will be constructed in an existing valley. Water will be supplied from the reservoir to the townships and farms through two separate water supply systems. Figure 1 shows preliminary design decisions for the township, the dairy farms and the reservoir. As an engineering design consultant, you are asked to provide a conceptual design of the water storage reservoir and the water supply systems. The conceptual design has to address several key aspects of these facilities that are outlined as separate tasks below. The conceptual design has to be presented as a design report with appendices. Propose names for the township and the water storage reservoir and use these names in your design report. Town water tower Town water Embankment distribution centre Dam Proposed township location Embankment Dam Farm water Embankment Proposed distribution centre Dam location of farms Figure 1: Preliminary design decisions for township, dairy farms and reservoir (not to scale) 1/5Task 1. Ground Model Prepare a critical geological cross-section BH1 – BH8 of the ground model using the site investigation data provided in Appendix A. The cross-section has to show the ground surface level, ground layers with depths and the location of the ground water table. Task 2. Water Storage and Catchment Calculate the reservoir storage volume and the catchment area required to provide reliable water supply to the township and dairy farms. For water supply…

Attachments:

Writerbay.net

Do you need help with this or a different assignment? In a world where academic success does not come without efforts, we do our best to provide the most proficient and capable essay writing service. After all, impressing professors shouldn’t be hard, we make that possible. If you decide to make your order on our website, you will get 15 % off your first order. You only need to indicate the discount code GET15.


Order a Similar Paper Order a Different Paper